They may be a little tired??
We hired pool experts to level the ground and put the pool in correctly. We didn't want another leaning pool.
They were so careful when they did it. This guy took his shoes off and walked in his socks on the liner. When the other liner was put in he put on soft boots.
Here he is with his boots on.
There it is. Now we have to figure out what to do around it to help with all the mud!
It took about 12 hours to fill. We had both our hoses running.
The solar cover warming it up.
The kids first swim. It was a little chilly because they didn't let it warm long enough. Now with the cover on it maintains 90 degrees. I love it!

No comments:
Post a Comment